로고

  • Technology
  • New Technology
  • Technology

    We are constantly striving and researching to improve quality and strive for higher quality.

    New Technology

    We are constantly striving and researching to improve quality and strive for higher quality.

    Pack drain construction method using 6-axis equipment (TPD) in an equilateral triangle arrangement

    Ministry of Land, Infrastructure and Transport New Technology No.
           269
    Date of issue
           August 3, 2001
    Issuing agency
           Minister of Land, Infrastructure and Transport, Republic of Korea
    Protection Period
           3 years from the date of announcement

    본문

    Detail

    This is a construction method that improves the principle of the pack drain method to facilitate compaction drainage and improve constructability. It changes the drain distribution from a square distribution to a triangular arrangement to keep the effective drainage distance short and reduces the casing diameter from 120 mm to 100 mm, thereby maintaining the casing bottom area of ​​the four axes with the same cross section and enabling simultaneous construction on six axes.