Pack drain construction method using 6-axis equipment (TPD) in an equilateral triangle arrangement
Ministry of Land, Infrastructure and Transport New Technology No. | 269 |
---|
Date of issue | August 3, 2001 |
Issuing agency | Minister of Land, Infrastructure and Transport, Republic of Korea |
Protection Period | 3 years from the date of announcement |
본문
Detail
This is a construction method that improves the principle of the pack drain method to facilitate compaction drainage and improve constructability. It changes the drain distribution from a square distribution to a triangular arrangement to keep the effective drainage distance short and reduces the casing diameter from 120 mm to 100 mm, thereby maintaining the casing bottom area of the four axes with the same cross section and enabling simultaneous construction on six axes.