    Chosuk HD is a specialized company in soft ground improvement, with accumulated construction methods and know-how since 1970.

    Construction Method

    Chosuk HD is a specialized company in soft ground improvement, with accumulated construction methods and know-how since 1970.

    S.C.P (Sand Compaction Pile)

    페이지 정보

    본문

    Compaction, reinforcement and consolidation drainage 



    1. Overview of the method 


    1) Principle of the method

      ① A method of creating a large-diameter compacted sand pile in soft ground. (Compaction, reinforcement, and consolidation drainage).

      ② When used in conjunction with loading soil, it is possible to increase the initial embankment height and shorten the construction period.

    2) Applicability 

      ① Applicable to almost all grounds such as tank foundations, sandy soil and clay soil, landfills, port facilities, foundations of wastewater treatment facilities, sedimentary soil, etc.

      ② Areas where weight, large-scale construction, and construction period shortening are required.

      ③ When selecting a more powerful and reliable ground improvement method.

      ④ One construction machine can replace S.D. at any location and depth.



    2. Construction method characteristics


    1) Sandy soil

      ① Prevents liquefaction during earthquakes and vibrations.

      ② Increases shear strength of the soil (increases horizontal load).

      ③ Reduces compressive settlement.

      ④ Homogenizes the soil by compaction.


    2) Clay soil

      ① Increases shear resistance of the soil by creating a composite soil.

      ② Increases bearing capacity and prevents active destruction.

      ③ Reduces compressive settlement (DRAIN effect).

      ④ Residual settlement stabilizes extremely early.

      ⑤ Prevents uneven settlement with the composite soil function.



    3. Construction method and order

    0c8802f0380c192bb46616454d28d4f3_1725773603_838.png


    1) Measure and mark the pouring location with red cloth.

    2) CASING penetration and sand injection. 

    3) CASING extraction.

    4) CASING compaction (re-penetration).

    5) CASING extraction. 


    6) CASING compaction (re-penetration).


    7) Repeat steps 3) to 6).


    8) Move to the next construction location.