Real-time automatic recording system of construction data used in the integrated high-pressure injection method combining hammer and rod
Patents No. | 10-2442298 |
---|
Application date | July 06, 2022 |
Date of issue | September 06, 2022 |
Issuing agency | Commissioner of the Korean Intellectual Property Office |
본문
Detail
This invention enables the ground excavation work and the injection of filler for soft ground improvement to be processed in one operation without replacing the rod and removing the air hammer, and it can significantly reduce construction time and cost by allowing the soft ground improvement work to be processed without error even at sea.
It has the effect of maximizing construction quality and preventing the causes of poor construction in advance by checking construction data in real time. For this purpose, an integrated high-pressure injection method and a real-time automatic recording system are used.